SB 9 Feasibility

Does my lot qualify for an SB 9 lot split or duplex?

SB 9 lets qualifying single-family lots be split in two, with up to two homes on each — a path to as many as four homes where one stood. But eligibility turns on parcel-level details: zoning, prior rentals, historic status, hazard zones, and lot geometry. Our Brick Work report ($250) screens your parcel against SB 9 and every other California housing law that applies, runs the realistic unit scenarios, and — where an SB 9 lot split applies — includes a 3D massing diagram so you can see the buildable envelope.

Who orders this report

  • Owners of single-family lots exploring a split, a second home, or both
  • Small developers hunting SB 9 candidates before making offers
  • Agents listing R-1 properties whose value story is the split
  • Families planning a second home on the same lot for relatives or income
Brick Work report
$250
Delivered in 2 business days
Order now

Every number cited to the code section that grants it. Statewide coverage; deepest data in Los Angeles County.

What we check on your parcel

1SB 9 eligibility: zoning, size, prior tenancy history, and the statutory exclusions
2Lot-split geometry — whether your parcel can actually be divided into two conforming lots
3Unit scenarios: duplex on one lot, homes on both, and ADU combinations
4Objective design standards, setbacks, and height limits the city can apply
5Utilities, access, and site constraints that shape the buildable envelope

Red flags we screen before you spend a dollar

  • Rent Stabilization Ordinance (RSO) units and SB 8 replacement/relocation obligations
  • Historic districts (HPOZ) and potential historic resources
  • Specific plans, Q conditions, D limitations, and CPIO overlays
  • Hillside, Very High Fire Hazard Severity, and coastal zones
  • Utility, access, and easement constraints that change what is buildable

What the Brick Work report includes

  • Parcel-specific SB 9 eligibility determination, cited to the statute
  • Lot-split and unit-count scenarios with setbacks and height limits
  • A 3D massing diagram of the recommended scenario, where an SB 9 lot split applies
  • Red-flag screen: RSO history, historic, hazard zones, overlays
  • Next steps for the ministerial application path

Common questions

Up to four across the two lots created by a split — two on each. Combined with ADU rules, some parcels support more; the report runs the realistic combinations for your specific lot.

Chat with Aria