Brick+Work

Highland Park 12 Unit Potential

Highland Park 12 Unit Potential

APN:

$

RD1.5-1-HPOZ
Zone/District
12
Max Unit
11,735 sq. ft.
Lot Size
Tier 3
TOC
1
Lots
Existing Conditions
Floor Area 3,347 sq. ft.
Units 3
Year Constructed 1941/1961
Assessed Improvement Value $78,526
Assessed Land Value $196,357
Development Potential (By-Right)
Maximum FAR 3:1
Maximum Height
Feet

45 ft.

Stories

None

Buildings used entirely for residential uses (and ground floor commercial in RAS zones) are only limited in height, not stories.

Minimum Setbacks
Front

15 ft.

Side

5 ft.

add 1 ft. of side setback for each story over 2, not to exceed 16 ft.

Back

15 ft.

Max Buildable Area, Footprint 8,364 sq. ft.
Max Buildable Area, Envelope 25,092 sq. ft.
Max Dwelling Units 7
Affordable Units Required None
Parking Required 1 space per unit with less than 3 habitable rooms 1.5 spaces per unit with 3 habitable rooms 2 spaces per unit with more than 3 habitable rooms 1 space per guest room (first 30)
Required Bicycle Parking
Long Term 1 per dwelling unit or guest room
Short Term 1 per 10 dwelling unit or guest room
Transitional Height Limitations Portions of Buildings in C or M zones with certain distances of RW1 or more restrictive zones shall not exceed the following limits: Distance (ft.) Height (ft.) 0-49 25 50-99 33 100-199 61
Required Open Space 100 sq ft per unit with less than 3 habitable rooms 125 sq ft per unit with 3 habitable rooms 175 sq ft per unit with more than 3 habitable rooms
Other Development Notes Per Specific Plan, newly constructed multifamily units must be at least 2 bedrooms.
Development Potential (with TOC or DB)
Maximum FAR 4.35:1
Maximum Height
Feet

67 ft.

Projects located in a zone where the maximum height is 45 ft. or less, or located within a Specific Plan that limits height, height increases over 11 ft. must be stepped-back at least 15 ft. from the exterior face of the ground floor building located at any street frontage.

Stories

None

Minimum Setbacks
Front

15 ft.

Side

3.5 ft.

add 1 ft. of side setback for each story over 2, not to exceed 16 ft.

Back

10.5 ft.

Max Buildable Area, Footprint 9,174 sq. ft.
Max Buildable Area, Envelope 39,907 sq. ft.
Max Dwelling Units 12
Affordable Units Required at least 10% for Extremely Low Income residents, or 14% for Very Low Income residents, or 23% for Low Income Residents
Parking Required less than .5 spaces per unit
Required Bicycle Parking
Long Term 1 per dwelling unit or guest room
Short Term 1 per 10 dwelling units or guest rooms
Transitional Height Limitations When bordering specific plan, overlay zone, or RW1 or more restrictive zone, the building height limit shall be stepped-back at a 45 degree angle as measured from a horizontal plane originating 25 ft. above grade at the property line of the adjoining lot.
Required Open Space Up to 25% decrease in open space required by-right.
Other Development Notes Per Specific Plan, newly constructed multifamily units must be at least 2 bedrooms.
Jurisdictional
Legal Description Lot C, Tract P M 4197
Land Use Low Medium II Residential
Area Planning Commission East Los Angeles
Community Plan Area Northeast Los Angeles
Neighborhood Council Historic Highland Park
Council District 1
Councilmember Gilbert Cedillo
Red Flags
Properties subject to the Rent Stabilization Ordinance (RSO) must replace existing affordable units at a rate of 1 to 1 or 20% of new proposed units, whichever is greater.
Property is subject to the guidelines of the Highland Park-Garvanza Historic Preservation Overlay Zone, which could limit the development potential of the site.
Property is subject to the requirements of the Avenue 57 Transit Oriented District Specific Plan, which could limit the development potential of the site.
Property is subject to the City of Los Angeles Baseline Hillside Ordinance, which could limit the development potential of the site
BRICK+WORK Analyzer
Calculator
Please Enter Land Cost.
Please Enter Average Rents in Area.
Ask Administrator to enter the required values for the calculation of Financial Analyser.
Particulars By-Right TOC or DB
Total Buildable
Net Buildable
Average Construction Cost
Total Construction Budget
Total Soft Costs
Total Development Budget
Gross Annual Rents
Expenses (25%)
NOI
Valuation
Equity After Completion
Equity Multiple
IRR

Property Report Disclaimer

All data are obtained from government sources. No attempt has been made to verify the data’s accuracy.

This report is for informational purposes only. Do not rely on this report to support real estate or investment decisions. The only authoritative source for the information in this report is the government agencies from which the data was obtained.

By publishing this property, you represent and warrant that you have obtained the authorization from the property owner to market this property AND to take actions on behalf of the property owner.