Brick+Work

Canoga Park C2 Corner Lot, 21 Potential Units with TOC Tier 1

CANOGA PARK

Canoga Park C2 Corner Lot, 21 Potential Units with TOC Tier 1

APN: 2023-004-015

$

[Q]C2-1VL
Zone/District
21
Max Unit
4,979 sq. ft.
Lot Size
Tier 1
TOC
1
Lots
Existing Conditions
Floor Area 945 sq. ft.
Units 1
Year Constructed 1951
Assessed Improvement Value $87,835
Assessed Land Value $187,755
Development Potential (By-Right)
Maximum FAR 0.5:1
Maximum Height
Feet

45 ft.

Stories

3

Buildings used entirely for residential uses (and ground floor commercial in RAS zones) are only limited in height, not stories.

Minimum Setbacks
Front

0 ft.

Side

0 ft. for commercial uses; 5 ft. for residential uses

add 1 foot of side setback for each story over 2, not to exceed 16 ft.

Back

0 ft. for commercial uses; 15 ft. for residential uses

add 1 foot of back setback for each story over 3, not to exceed 20 ft.

Max Buildable Area, Footprint 5,429 sq. ft.
Max Buildable Area, Envelope 2,714 sq. ft.
Max Dwelling Units 13
Affordable Units Required None
Parking Required 1 space per unit with less than 3 habitable rooms 1.5 spaces per unit with 3 habitable rooms 2 spaces per unit with more than 3 habitable rooms 1 space per guest room (first 30)
Required Bicycle Parking
Long Term 1 space per unit for units 0-25; 1 spaces per 1.5 units for units 26-100; 1 spaces per 2 units for units 101-200; 1 spaces per 4 units for units 201+
Short Term 1 space per 10 units for units 0-25; 1 spaces per 15 unit for units 26-100; 1 spaces per 20 units for units 101-200; 1 spaces per 40 unit for units 201+
Transitional Height Limitations Portions of Buildings in C or M zones with certain distances of RW1 or more restrictive zones shall not exceed the following limits: Distance (ft.) Height (ft.) 0-49 25 50-99 33 100-199 61
Required Open Space 100 sq ft per unit with less than 3 habitable rooms 125 sq ft per unit with 3 habitable rooms 175 sq ft per unit with more than 3 habitable rooms
Other Development Notes
Development Potential (with TOC or DB)
Maximum FAR 2.75:1
Maximum Height
Feet

56 ft.

Projects located in a zone where the maximum height is 45 ft. or less, or located within a Specific Plan that limits height, height increases over 11 ft. must be stepped-back at least 15 ft. from the exterior face of the ground floor building located at any street frontage.

Stories

4

Buildings used entirely for residential uses (and ground floor commercial in RAS zones) are only limited in height, not stories.

Minimum Setbacks
Front

0 ft.

Side

0 ft. for commercial uses; 5 ft. for residential uses

Back

0 ft. for commercial uses; 15 ft. for residential uses

add 1 foot of back setback for each story over 3, not to exceed 20 ft.

Max Buildable Area, Footprint 5,429 sq. ft.
Max Buildable Area, Envelope 14,929 sq. ft.
Max Dwelling Units 21
Affordable Units Required at least 8% for Extremely Low Income, or 11% for Very Low Income, or 20% for Low Income
Parking Required Shall not exceed .5 space per unit
Required Bicycle Parking
Long Term 1 space per unit for units 0-25; 1 spaces per 1.5 units for units 26-100; 1 spaces per 2 units for units 101-200; 1 spaces per 4 units for units 201+
Short Term 1 space per 10 units for units 0-25; 1 spaces per 15 unit for units 26-100; 1 spaces per 20 units for units 101-200; 1 spaces per 40 unit for units 201+
Transitional Height Limitations The building height limit shall be stepped-back at a 45 degree angle as measured from a horizontal plane originating 15 feet above grade at the property line of the adjoining lot in the RW1 Zone or more restrictive residential zone
Required Open Space Up to 20% decrease in required open space
Other Development Notes
Jurisdictional
Legal Description FR 75, TR 8197
Land Use General Commercial
Area Planning Commission South Valley
Community Plan Area Canoga Park-Winnetka-Woodland Hills-West Hills
Neighborhood Council Canoga Park
Council District 3
Councilmember Bob Blumenfield
Red Flags
Per Ord No. 173518, the project site is limited to a maximum floor area ratio of 0.5:1.
BRICK+WORK Analyzer
Calculator
Please Enter Land Cost.
Please Enter Average Rents in Area.
Ask Administrator to enter the required values for the calculation of Financial Analyser.
Particulars By-Right TOC or DB
Total Buildable
Net Buildable
Average Construction Cost
Total Construction Budget
Total Soft Costs
Total Development Budget
Gross Annual Rents
Expenses (25%)
NOI
Valuation
Equity After Completion
Equity Multiple
IRR

Property Report Disclaimer

All data are obtained from government sources. No attempt has been made to verify the data’s accuracy.

This report is for informational purposes only. Do not rely on this report to support real estate or investment decisions. The only authoritative source for the information in this report is the government agencies from which the data was obtained.

By publishing this property, you represent and warrant that you have obtained the authorization from the property owner to market this property AND to take actions on behalf of the property owner.